Commit message (Collapse) | Author | Age | Files | Lines | |
---|---|---|---|---|---|
* | testing/outils: upgrade to 0.4.1 | Sören Tempel | 2016-04-01 | 1 | -5/+8 |
| | |||||
* | testing/outils: Split package into multiple subpackages | Sören Tempel | 2016-03-20 | 1 | -5/+31 |
| | |||||
* | testing/outils: don't remove man pages manually | Sören Tempel | 2016-01-21 | 1 | -8/+1 |
| | | | | The OpenSSL man pages have been renamed. | ||||
* | testing/outils: don't conflict with openssl | Sören Tempel | 2015-12-07 | 1 | -2/+9 |
| | |||||
* | testing/outils: upgrade to 0.3 | Sören Tempel | 2015-11-20 | 2 | -218/+10 |
| | |||||
* | testing/outils: don't conflict with main/coreutils | Sören Tempel | 2015-10-03 | 1 | -5/+9 |
| | |||||
* | testing/outils: don't depend on mcpp | Sören Tempel | 2015-09-30 | 1 | -2/+2 |
| | | | | | | | | cpp(1) is only used by calendar(1) furthermore the required command line flags are incompatible with mcpp(1) therefore gcc needs to be installed optionally since it ships cpp(1). So if you want to use calendar(1) just install gcc. | ||||
* | testing/outils: new aport | Sören Tempel | 2015-09-28 | 2 | -0/+245 |